- £5,800,000 redevelopment of a 4 storey Grade 2 listed building.
- Major deconstruction of the existing building requiring the design and installation of a temporary facade retention scheme.
- Extensive ground works including piling and underpinning works. Extreme challenging logistics in the removal of debris from site due to the buildings location.
- Construction of new basement fully waterproofed.
- Concrete frame and floor construction and steel and timber roof frame.
- Green roof installation.
- External stone and brick cladding with timber and steel windows.
- Construction of new bespoke finishes such as joinery, structural glazing and stairways.
- Complete new mechanical, electrical and public health installation.
- New lift installation.
- Extensive site restrictions requiring installation and operation of a crane for material movement.
- Intricate Party wall and neighbourly issues. Working in the vicinity of International Embassies and Schools.
- Considerable design & build packages. Extensive coordination and ‘working up’ buildable solutions.
- Retaining façade and demolition of the mews building.
- Complete new construction of mews building.
- High End residential fit out of the mews building.